Roland LEC-300A Guia de preparacion Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
1
Contents
Company names and product names are trademarks or registered trademarks of their respective
holders.
http://www.rolanddg.com/
Copyright © 2009-2012 Roland DG Corporation
Contents ........................................................................................................1
To Ensure Safe Use ....................................................................................... 2
Pour utiliser en toute sécurité .....................................................................9
Setup Guide ........................................................................................................ 17
1. Installation Environment ..........................................................................18
Deciding On an Installation Site ...............................................................................................18
Temperature and Humidity ........................................................................................................19
Installation Space ...........................................................................................................................20
Air Ventilation ..................................................................................................................................20
2. Included Items .........................................................................................21
3. Assembling and Installing ........................................................................ 23
Step 1: Assemble the Stand ........................................................................................................23
Step 2: Mount the Machine .......................................................................................................29
Step 3: Install the Drain Bottle ...................................................................................................30
Step 4: Remove the Packing Materials .................................................................................... 32
Step 5: Attach the Rear Cover ....................................................................................................34
Step 6: Attach the Media Guide ................................................................................................35
4. Connecting the Cables ............................................................................36
Connecting the Cable of the Take-up Unit ............................................................................36
Connecting the Power Cord and the Network Cable ........................................................37
5. Installing the Ink Cartridges(LEC-300A) .................................................. 38
Filling with Ink for the First Time ...............................................................................................38
Axing the Cartridge-slot Labels .............................................................................................38
Installing the Ink Cartridges .......................................................................................................40
6. Installing the Ink Cartridges (LEC-330) ...................................................45
Ink Mode ............................................................................................................................................ 45
Filling with Ink for the First Time ...............................................................................................45
Axing the Cartridge-slot Labels .............................................................................................45
Selecting the Ink Mode ................................................................................................................47
Installing the Ink Cartridges .......................................................................................................49
7. Installing the Blade ..................................................................................53
8. Network Settings .....................................................................................55
Introduction .....................................................................................................................................55
Step 1: Make the Network Settings for the Computer ......................................................55
Step 2: Make the Network Settings on the Printer .............................................................57
Step 3: Make the Port Settings for the Software RIP .......................................................... 59
9. Installation of Ventilating Equipment .......................................................60
Ventilating Equipment .................................................................................................................60
Installing the Ventilating Equipment ......................................................................................60
Vista de pagina 2
1 2 3 4 5 6 7 8 ... 67 68

Comentarios a estos manuales

Sin comentarios