Roland LEC-330 Guia de preparacion Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
1
Contents
Company names and product names are trademarks or registered trademarks of their respective
holders.
http://www.rolanddg.com/
Copyright © 2009 Roland DG Corporation
To Ensure Safe Use .....................................................................................2
Pour utiliser en toute sécurité ....................................................................9
Setup Guide ........................................................................................................17
1. Installation Environment ..........................................................................18
Deciding On an Installation Site ...............................................................................................18
Temperature and Humidity ........................................................................................................19
Installation Space ...........................................................................................................................20
Air Ventilation ..................................................................................................................................20
2. Included Items .........................................................................................21
3. Assembling and Installing ........................................................................23
Step 1: Assemble the Stand ........................................................................................................23
Step 2: Mount the Machine .......................................................................................................29
Step 3: Install the Drain Bottle ...................................................................................................30
Step 4: Remove the Packing Materials ....................................................................................32
Step 5: Attach the Rear Cover ....................................................................................................34
Step 6: Attach the Media Guide ................................................................................................35
4. Connecting the Cables ............................................................................36
Connecting the Cable of the Take-up Unit ............................................................................36
Connecting the Power Cord and the Network Cable ........................................................37
5. Installing the Ink Cartridges(LEC-300A) ..................................................38
Filling with Ink for the First Time ...............................................................................................38
Installing the Ink Cartridges .......................................................................................................38
6. Installing the Ink Cartridges (LEC-330) ...................................................42
Filling with Ink for the First Time ...............................................................................................42
Axing the Cartridge-slot Labels .............................................................................................42
Selecting the Ink Mode ................................................................................................................43
Installing the Ink Cartridges .......................................................................................................46
7. Installing the Blade ..................................................................................50
8. Network Settings .....................................................................................52
Introduction .....................................................................................................................................52
Step 1: Make the Network Settings for the Computer ......................................................52
Step 2: Make the Network Settings on the Printer .............................................................54
Step 3: Make the Port Settings for the Software RIP ..........................................................56
9. Installation of Ventilating Equipment .......................................................57
Ventilating Equipment .................................................................................................................57
Installing the Ventilating Equipment ......................................................................................57
Vista de pagina 2
1 2 3 4 5 6 7 8 ... 67 68

Comentarios a estos manuales

Sin comentarios